Job description
Roughly 1 cubic metre of soil moved from a mound and distributed over an area roughly 10 metres away. Also a trench dug roughly 10cms deep for a pathway roughly 2 metres wide and 8 metres long to be filled with sand. Sand will be supplied. No urgency, can be started any day.