Excavator (Brokk/Butor) Operators - Sydney Metro, Western Sydney AirportCPB Contractors in joint venture with Ghella have been selected by the NSW Government to deliver the Sydney Metro - Western Sydney Airport Station Boxes and Tunnelling Works (WSA-SBT). The project will involve the design and construction of a new metro tunnel around 9.8 kilometres in length between St Marys in the north and the Aerotropolis Core precinct in the south.The design and construction scope includes the following:
- two sections of twin running, tunnel boring machines, tunnels with a total combined length of approximately 9.8 km, plus associated portal dive structures and tunnel support activities
- station box excavations with temporary ground support at St Marys, Orchard Hills, Western Sydney Airport Terminal, Western Sydney Aerotropolis and two intermediate service facilities, one in each of the tunnel sections.
- Minimum 3-5 years' experience working as a excavator operator.
- Experience operating Brokk/Butor excavators (requirement)
- Tunnelling experience (desirable)
- Construction White Card
- Unit of Competency - Conduct civil construction excavator operations