Civmec has secured the award of a major construction contract for Pilbara Minerals at their Pilgangoora site in the Pilbara region of Western Australia.
This is a Greenfields lithium project and the scope includes the SMPEI construction of new and parallel processing structures and equipment to expand the mines nameplate capacity to 1000ktpa. Civmec will construct an additional grinding and classification circuit, Pre-flotation magnetic separation circuit, a duplicated flotation circuit, wet processing circuit, reagents facility, a product and storage facility, along with the provision of supporting water, air, and power infrastructure services. Civmec will also be installing several large vendor equipment packages, such as thickeners, a ball mill, and filter press.