Reporting in to Engineering Manager you will be responsible for developing a Functional Description that includes upgrades (VSD's and impellors x 2) and how these will work including software development and implementation. You will also complete a Switch Room design to include enough room for all equipment allowing for maintenance access, develop tech spec and tender works.
You will be able to:
- Confirm HVAC Requirements (VSD's) and identify appropriate HVAC supplier and installer, develop tech spec and tender works.
- Ensure the fire suppression and fire detection systems comply with the AS, develop tech spec and tender works.
- Complete Switch Room Design to allow for preferred cable entry.
- Design of the electrical supply including racking routes and Switch Room entry points, develop tech spec and tender works.
- Develop an electrical estimate including all electrical supply and site installation.
If you are looking to work on the biggest project in NSW, on a project that has the potential to run and run then we want to speak to you.
Interested? APPLY NOW!!!